Client: Itochu Corporation, Japan
Toshiba Corporation, Japan
Babcock Hitachi K.K., Japan
Project Country: Romania
Project: Rehabilitation of Paroşeni Power Plant Unit 4, 150 MW
Engineering
The engineering services supplied by TSB included of basic and detail design for the 110kV substation, the ESP, HVAC system and civil works, detail design for the auxiliary parts of the boiler and the coal bunker steel structure and ducts, but also for parts of the electrical & automation system.
Procurement
From a procurement perspective TSB provided the material for steel structure, equipment for the 110 kV substation, ESP and HVAC system, but also the local boxes and cables. TSB also fabricated steel structure, ducts and parts of the piping circuit together with parts of the balance of plant.
Construction
TSB and its over 250 suppliers erected the boiler and the equipment from the boiler island such as coal mils, air preheater, etc., the balance of plant, HVAC system, electrical & automation system, ESP, 110kV substation and provided civil works.