30 Oct 2011

Termoelectrica – Paroşeni start-up

Client: Termoelectrica S.A., Romania
Project Country: Romania
Project: Turnkey construction of the start-up plant at Paroşeni

Engineering
The engineering services for this project included basic and detail design for civil works, building and architectural, thermo – mechanical system and also electrical & automation system.

Procurement
In its capacity by the general supplier, TSB provided the equipment (boiler and auxiliaries, electrical switchgears and the automation system including SCADA), but also steel structure material, thermo – mechanical material, cables, I&C components, and others. For this project we have fabricated steel structure, ducts, pipe circuits, stacks, supports and vessels.

Construction
The civil works and the erection services of the boilers and their auxiliary equipment (de-aerator, vessels, pumps, fans, etc.), the piping circuits including insulation, HVAC system, electrical & automation system and commissioning of the plant were provided by TSB.